ULA, Air Force Conclude System-Level Review of Vulcan Centaur Rocket; Tory Bruno Quoted

Jeff Brody
Tory Bruno

United Launch Alliance has completed the final design review of a company-developed launch vehicle as part of the process to secure certification from the U.S. Air Force.

The company said Monday it worked with USAF representatives during the week-long assessment on the Vulcan Centaur system.

ULA expects most of Centaur components such as fairing, upper stage engines, solid rocket motors and avionics to fly on the Atlas platform ahead of the new rocket's initial flight, which is projected to happen sometime in 2021.

Tory Bruno, president and CEO of ULA, said the company designed the rocket to help address U.S. space launch mission requirements and maintain the country's advantage in space.

The launch services provider invested money to equip its factor in Decatur, Ala., with modern production systems.

ULA is building flight hardware for the initial bringing in state-of-the art manufacturing technologies. Flight hardware is already being built for the maiden voyage of Centaur.

You may also be interested in...

Blue Origin

Blue Origin Launches 14th New Shepard Mission With Updated Crew Capsule

Blue Origin, a space company owned by Amazon CEO Jeff Bezos, used a capsule with updated crew systems during the company's 14th mission with the New Shepard rocket. The updated capsule featured new push-to-talk communications systems, noise reduction tools, cushioned wall linings, environmental systems and a crew alert system, Blue Origin said Thursday.

Teledyne

Teledyne Subsidiary to Produce Additional Navy LCS Missile Defense Modules

A Teledyne Technologies subsidiary has secured an $18M contract from Northrop Grumman to manufacture four more missile defense systems for the U.S. Navy's littoral combat ship mission package.

Orion

Lockheed’s Orion Spacecraft Concludes Assembly, Testing for NASA’s Artemis Mission to Lunar Orbit

Lockheed Martin has sent the Orion capsule to NASA’s exploration ground systems team for final preparations ahead of the unmanned Artemis I mission to lunar orbit that will launch later this year. The spacecraft concluded assembly operations and testing at Kennedy Space Center in Florida.